Considering the addition of a room to your home? Congratulations! A room addition in the Springfield, MO Area presents a wonderful opportunity to significantly enhance your living space while simultaneously increasing the value of your property. Here at Ozark Construction, we take the time to attentively listen to your ideas and craft the ideal plan to bring your vision to life.

Rest assured, we never compromise on quality and always adhere to the best practices when it comes to designing room additions. This ensures that you and your family will enjoy both increased space and enhanced property value once your new room addition is finished.

Master Bedroom

Cost: $325-$375/sq ft
Planning Timeline: 1-3 months. This includes preliminary plans and construction document production.
Construction Timeline: 3-6 months. This varies largely based on the size of your project. Most of our additions are completed within 5 months but inspection periods can delay progress. Allow 1 month for permitting on most major projects.

The most common addition is that of a master suite. This typically includes a master bedroom, 1 or 2 walk-in closets, and a large master bathroom with a tub & shower (or sometimes a single oversized shower). Building in an open, flat yard area where walls can be adjoined easily to existing walls is extremely cost effective. If there is minimal plumbing and electrical, costs can be around $325/sq ft or less. Conversely, the more elaborate the plumbing and electrical, the higher the sq ft cost. We have seen 1st-floor additions reach $375/sq ft, when using luxury finishes and complicated plumbing/electrical layouts. Projects of this size can vary in length, but a typical planning timeline is 2 months to produce plans. Construction can vary between 3-6 months based on various factors, including inspections & permitting.

Garage Addition

Cost: $150-$250/sq ft
Planning Timeline: 1-2 months. This includes preliminary plans and construction document production.
Construction Timeline: 2-4 months. This varies largely based on the size of your project. Most of our garage additions are completed within 4 months, but inspection periods can delay progress. Allow 1 month for permitting on most major projects.

Garage additions can usually be completed without the amount of finish work required for interior living space. We have had customers add single, double, or even tandem garages to their existing homes. Often, there is minimal electric (lights, garage door, and a few outlets) almost no plumbing, and no wall finish required. This can bring costs of construction as low as $80/sq ft in some cases. In most cases, a garage cost of construction is around $100/sq ft. As always, the costs are highly dependent on the specifics of your project.